Aller au contenu
The energy one stop shop — active across Belgium
Price & quote2026

Geothermal heat pump price in Belgium in 2026

The geothermal heat pump offers the most stable COP of all technologies — even in the depths of winter. The entry cost is higher, but grants and long-term savings more than make up for it. Here are the real 2026 ranges by type of ground loop.

from 15 000 € horizontal collectors installed
COP 4–5 stable all year round
grants up to 6 000 € in Wallonia for geothermal
Price grid

Geothermal heat pump price by ground-loop type and power

Ranges for a ground-water heat pump supplied and installed, borehole or collectors, hydraulic and electrical connection included. Excludes the drilling permit and works to adapt the existing heating network.

Prices verified in January 2026 · updated every year
Ground-loop type Low power
6 kW · compact house
Medium power
10 kW · 3–4-sided house
High power
14 kW+ · large house
Horizontal collectorsLarge plot required 15 000– 17 000 €17 000– 19 000 €19 000– 20 000 €
Single-probe boreholeThe most common solution 20 000– 23 000 €23 000– 26 000 €26 000– 28 000 €
Double-probe boreholeHigh power or poor ground 25 000– 28 000 €28 000– 32 000 €32 000– 35 000 €

Indicative prices incl. VAT, supply, drilling and installation included, grants not deducted. The exact sizing is established during the free quote. General page: prices of all heat pumps.

The price factors

What makes the price of your geothermal heat pump vary

For the same power, a borehole in clay soil and a borehole in massive rock do not cost the same. Here are the six line items that really weigh on the geothermal budget.

  • Type of ground loop

    Horizontal collectors (land required, shallower) or vertical borehole (80–150 m probe): this is the first cost factor. Collectors are cheaper to lay but require a large available surface.

  • Drilling depth

    Each metre drilled costs between 30 and 50 € depending on the equipment used and the nature of the ground. A 100 m probe represents 3 000 to 5 000 € of drilling alone.

  • Nature of the ground

    Moist clay soil conducts heat better than dry gravelly soil: it allows shallower probes. A preliminary geothermal study (100–300 €) can avoid costly oversizing.

  • Power and buffer tank

    The power (kW) is sized on the heat losses of the home. A buffer tank of 200 to 300 L (1 000– 2 500 €) improves comfort and the lifespan of the heat pump.

  • Authorisations and permits

    In Belgium, a geothermal borehole requires a declaration or a permit depending on the region and the depth. Administrative fees range from 200 to 800 € depending on the municipality.

    Geothermal heat pump — complete guide →
  • Electrical connection

    A geothermal heat pump of 10 kW or more often requires a three-phase meter and a dedicated sub-panel. This item can represent an additional 600 to 1 200 €.

Grants & subsidies 2026

The grants that lower your geothermal heat pump

Geothermal benefits from the highest grants among all heat pump technologies — up to 6 000 € in Wallonia. Here are the 2026 benchmarks and the conditions to meet.

Wallonia

Prime Habitation

up to 6 000 € geothermal · the highest heat pump grant

When replacing fossil-fuel heating, the Walloon geothermal grant reaches 6 000 € for middle-income households, scaled upward according to income.

  • Replacement of a fossil-fuel generator (oil, gas, coal)
  • Ground-water heat pump with COP ≥ 4.0 (A++ label or higher)
  • Borehole carried out by an approved driller and declared to the region
Heat pump grant details in Wallonia →
Brussels-Capital

Renolution grants

up to 4 500 € increased by income and type of home

Support for installing a high-performance heat pump, geothermal included, with three income categories and a bonus for very energy-hungry homes.

  • Ground-water heat pump for central heating
  • Home over 10 years old
  • Certified installer and itemised invoice
Heat pump grant details in Brussels →
Grants calculated & deducted

Get your price net of grants, in 48 h

We check your entitlements, cost it net of grant and build the file: you advance nothing.

The process, the wendows way
  1. We check your entitlements

    Region, income, current heating type: we identify the grants you can claim for geothermal.

  2. We carry out the feasibility study

    Nature of the ground, available surface, required power: we determine the suitable type of ground loop.

  3. We build the file

    Drilling declaration, grant forms, technical certificates: we handle everything.

  4. We deduct where possible

    The grant is subtracted from your bill, with no cash advance on your side.

6% VAT in renovation (home > 10 years) 2026 amounts · to reconfirm based on your situation

Are you in Flanders? The Mijn VerbouwPremie also covers geothermal heat pumps — ask us for the details for your municipality.

Mini-estimator

A range in 10 seconds

Choose your type of ground loop for a ballpark figure. The free quote remains the only accurate estimate.

1 Ground-loop type
2 Number of heat pumps
1
Estimated budget · installed
15 000 – 20 000 €
supply, drilling and connections included
Grants: up to −4 000 € depending on your region and your income
Affiner avec un conseiller →

Indicative estimate, excluding the drilling permit and adaptation of the heating network.

Costed example

What a real geothermal quote looks like

A concrete case to make the ranges meaningful — your project will be costed based on your needs and the nature of your land.

4-sided house in NamurGround-water heat pump 10 kW · 100 m vertical borehole · existing underfloor heating
Ground-water monobloc heat pump 10 kWViessmann Vitocal or equivalent 9 500 €
100 m vertical borehole (1 probe)approved driller, drilling equipment, sealing grout 4 500 €
Hydraulic connectionprobe-to-heat-pump link, expansion vessel, circulator 2 800 €
200 L buffer tankintegrated into the primary circuit 1 200 €
Electrical connectionthree-phase sub-panel + protection 900 €
Total works, supply and installation included18 900 €
6% VAT (renovation, home > 10 years)included
Estimated Prime Habitation (Wallonia) — geothermal− 5 000 €
Remaining payable by you ≈ 13 900 €

Indicative example dated 2026, excluding the drilling declaration and network adaptation. Request your quote for pricing tailored to your home.

Price FAQ

Your questions about the price of a geothermal heat pump

How much does a geothermal heat pump cost in 2026?

In Belgium, expect between 15 000 and 20 000 € for a ground-water heat pump with horizontal collectors, and between 20 000 and 28 000 € for a single-probe vertical borehole. All included (supply, drilling and installation), grants not deducted.

Is the borehole included in the price?

Yes, in our ranges the borehole is included. It generally represents 3 000 to 5 000 € for an 80 to 120 m probe, carried out by a specialist approved driller. The quote details every item so there are no surprises.

Do horizontal collectors cost less than the borehole?

Yes, horizontal collectors (15 000– 20 000 €) are cheaper than a vertical borehole (20 000– 28 000 €) because they require less deep work. In return, they require a large available plot of land (300 to 500 m² depending on the power).

What grants are there for a geothermal heat pump in Wallonia?

In Wallonia, the Prime Habitation can reach 6 000 € for a geothermal heat pump replacing fossil-fuel heating — it is the highest heat pump grant. The amount is scaled according to income and the technical conditions of the installation.

Is a drilling permit mandatory?

Yes, a geothermal borehole is subject to a declaration or an authorisation depending on the region and the depth. In Wallonia, a borehole deeper than 10 m requires a works declaration. We handle this process and coordinate the approved driller.

What is the lifespan of a geothermal heat pump?

The heat pump itself has a lifespan of 20 to 25 years. The geothermal probes in the ground are designed for 50 years or more. It is the heat pump technology with the best long-term return on investment, notably thanks to a stable COP of 4 to 5 all year round.

Your exact geothermal price, costed and net of grants

The ranges give the ballpark — the quote gives the figure. Feasibility study, sizing, grants calculated, drilling file build: a single point of contact. In under a minute.

  • Free and no obligation
  • Grants & 6% VAT calculated and deducted
  • Costed quote within 48 working hours